What does C1 mean in knitting?

What does LPC mean in knitting?

Now you purl the next 2 stitches. Finally you come back to the 2 stitches on your cable needle and you knit them. This is called a 2/2 LPC which means that 2 stitches cross with 2 stitches forming a Left Purl Cross.

What does C1 over 2 left mean in knitting?

About. The 1 over 2 left cross is a three-stitch cable where there is one column of one knit stitch and one column of two knit stitches. The right knit stitch crosses over the column of two knit stitches, creating a cable that slants upwards and to the left.

What does C2 mean in knitting?

Knitting a 2/2 Right Cable Cross. Step 1. Work as directed by the pattern up to the stitches you will be cabling. The 2/2 Cable Cross involves 2 stitches crossing over another 2 stitches. It’s worked over 4 stitches total, so here we have our 4 stitches ready and waiting on the left needle (LN).

What does M stand for in knitting?

Also on this page:

Abbreviation Description
m marker
M1 or M1K make one stitch knitwise; single knit increase
M1R make one right; single right-leaning knit increase
M1L make one left; single left-leaning knit increase

What does RPC stand for in knitting?

Learn to Knit: How to Work A Right Purl Cross Cable (2/2 RPC) – Stolen Stitches.

IT\'S FUN:  What is Swedish embroidery?

What does k0 mean in knitting?

In patterns that include various sizes, zeros are sometimes necessary. For example, k0 (0,1) means if you are making the smallest or middle size, you would do nothing, and if you are making the largest size, you would k1.

What does R mean in knitting?

RS: Right side, meaning the right side of the fabric (the side meant to be shown on the outside). RT: Right twist, to twist two strands of yarn and cross stitches.

What does s11 mean in knitting?

That’s ‘slip 1 purl wise with the yarn in front’. With some fonts the 1 and l look alike. Move the yarn to the front, slip a stitch from left needle to the right as if you’re going to purl it, but don’t (just stick the right needle into it as if to purl), then bring the yarn back to knit 2 sts.